1. There are safety problems in the basic inspection work of the platform
According to the relevant data, in recent years, China's loadometer ground injury in the work of the situation has increased, mainly due to the construction of the loadometer during the process will be mixed with the detection of foundations, which makes the ground detection personnel need to be poor and Dangerous environment, so that its safety is threatened, for example, during the construction of the loadometer, usually using acoustic refraction and low strain and the situation of the way to detect the power of the probe, but these detection methods are not enough to detect Personnel to provide security protection, so in the detection, the need to take appropriate protective measures.

2. There is no corresponding management in the detection mechanism of the platform
In China's current project testing, the national inspection organization and intermediary inspection organization is the main part of its composition, the formation of such a reason mainly due to the detection organization has the non-consistency, which allows it to carry out detailed testing process Will encounter a lot of problems, in order to ensure the adverse impact of the quality of the weighbridge, such as often appear to reduce the price and industry monopoly, etc., and part of the organization for the purpose of achieving more resources, will test the standard blank test The report is sold to individuals or groups that do not have a certain qualification, which makes the quality of the test of the loadometer test item not be effectively guaranteed.

3. The test report of the foundation of the platform is not perfect
In the current base of the base load detection market, not only do not test the technical means to improve, but also to improve the detection report, mainly due to the detection of staff negligence and non-standard records, so that the final test report lack of certain Normative and standard, for example, not according to the relevant provisions and norms of the country to complete the test report; in the test of the standard reference, do not pay attention to the actual situation of the standard, the use of expired standards for its reporting value significantly reduced ; Some of the statements used in the technical terms can not meet the actual requirements, and even use the terms have been disabled; part of the test report used in the measurement unit is not uniform or non-standard situation, these to the construction unit to bring a certain inconvenient.

4. There is no certain standard for the contract in the foundation test
As the current load-bearing market needs to face more and more challenges, and competition is becoming more and more intense, which competition on the ground load test can be said to have entered the white-hot stage, when most of the loadometer foundation inspection department to make it in the detection market To occupy more status, the use of illegal competition means for vicious competition, such as deliberately to its floor load test costs to a minimum, so that the loadometer foundation inspection contract re-signing and implementation of the process there will be some hidden dangers, and to the loadometer foundation Of the detection market has a negative impact on the use of low-cost ground-based testing contract from the surface of the platform for the unit does not have an impact, but in the actual implementation process, when the market price is too low can not guarantee the cost There will be the use of inferior materials or equipment to save their own cost of the occurrence of the situation, which for the land load test results of the rationality and qualification will be a threat.